Madimack InverFlow Plus
Set up capacity-based pump control and understand which control source has priority.
01 / Start with the right guide
Match your equipment
Choose the InverFlow Plus entry only for the compatible pump and controller revision. Confirm newer replacement models separately; a similar product name does not guarantee the same connection or menu.
- 1Clyr app
- 2Clyr controller
- 3Pump communications interface
How the parts work together. This is a system overview, not a terminal wiring diagram.
02 / Get ready
Before you start
- Record the equipment model, controller generation and installed software version. Use the matching product manuals.
- Have a qualified installer isolate every relevant electrical supply and verify absence of voltage before opening equipment. Turning it off in the app does not isolate power.
- Confirm plumbing, priming and the poolโs safe operating speed range before testing.
03 / One step at a time
Set it up
Prepare the communication connection
Have the installer match RS485 A/B on the pumpโs cable to the approved Clyr data interface, with power isolated. Record the network and address. Leave unused input conductors individually secured according to the equipment instructions.
Resolve competing control inputs
The referenced manual gives active digital inputs priority over RS-485. Have the installer confirm which inputs are connected and how local controls behave before Clyr takes control. Do not remove another systemโs wiring without an approved control plan.
Choose capacity, not RPM
Open Settings โ Devices โ Add, then select the Clyr controller physically connected to this equipment. Open Pool Equipment and choose the item named below. App wording can vary by version.
Choose Madimack InverFlow Plus. Match the network and address. Set Default Capacity to the commissioned percentage; this pumpโs Clyr speed setting uses capacity percent rather than an RPM number.
Check the pumpโs response
Start at an appropriate commissioned capacity. Request a different safe percentage and verify the pumpโs local response and water movement. If it stays at a fixed speed, investigate active digital inputs and local overrides.
Make the schedule match the installation
After the manual checks pass, create the required event in Clyr. Review its start, finish and equipment settings. Keep heating and chlorination within verified pump operation; an overlapping schedule is not a safety interlock.
Shared app skill ยท not equipment wiring Follow the Clyr scheduling workflow. Select the equipment in this guide and use the times and settings commissioned for your pool.
Open on YouTube ยท 0:00โ1:51 โ
04 / Prove the result
Check it works
A saved setting tells you what you requested. These checks tell you what the equipment actually did.
- The selected pump starts and the actual pump speed changes when requested.
- Water circulation is established and there are no equipment faults or leaks.
- Stop produces the expected physical result. Any local pump override is understood.
- The first scheduled event is observed at the equipment, not only in the app.
05 / Find the next useful check
If something is wrong
The device is saved, but it does not respond
Check the selected controller, equipment type, physical network and address against the installerโs record. Check the equipmentโs own display for a fault. Isolate power before inspecting connections.
Manual control works, but the schedule does not
Check the eventโs day, time, selected device and requested value. Check whether Manual or Service mode is overriding scheduled operation. Return to the intended mode and observe the next event.
06 / Save for later
Keep these handy
Product instructions
- InverFlow Plus USA manual โ external control, PDF page 15 โ
- Madimack USA โ model-specific manuals โ
- Clyr installation and power guide โ
Use the manual supplied with your exact equipment and controller revision. If the connectors, labels or app choices differ, stop and contact Clyr with a photo of the model label and the screen you are on.
Ask Clyr for help โ